• Logistics Transportation/Connection/Tube Accessory
  • Logistics Transportation/Connection/Tube Accessory
  • Logistics Transportation/Connection/Tube Accessory
  • Logistics Transportation/Connection/Tube Accessory
  • Logistics Transportation/Connection/Tube Accessory
  • Logistics Transportation/Connection/Tube Accessory

Logistics Transportation/Connection/Tube Accessory

Type: Stainless Steel / Chrome Lean
Material: Iron
Connection Method: Seamless
Process: Cold Rolled
Certification: ISO, CE
Surface Treatment: Electrophoresis
Samples:
US$ 0.2/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Basic Info.

Model NO.
K-1009
Wall Thickness
6mm
Diameter
15cm
Color
Black
Metal
SPCC
Transport Package
8PCS/Box
Specification
350*280*150
Trademark
KING 9
Origin
China
HS Code
7307990000
Production Capacity
10000000PCS/Year

Product Description

    This product is widely used in the transfer of logistics, storage equipment, for the seamless connection between shelves and shelves.

    information:

    Item NO. K-1009 Surface electrophoresis Package /box 8
     Material SPCC Package size 350*280*150 Production Methoed diacasting





    Logistics Transportation/Connection/Tube Accessory

    Logistics Transportation/Connection/Tube Accessory
    FAQ:

    Q1: Are you manufacturer ?
    A: Yes,We are manufacture since from 2000, is a well-known company with good reputation in China even Asia.

    Q2: If I need sample, could you support?
    A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect.

    Q3: How do you pack your product?
    A: Packing steps for aluminum windows:
    Step 1.Protective tape protects frames from scratches;
    Step 2.Keep windows fixed on iron pallets;
    Step 3.Tie up windows on the iron pallets with plastic belts;
    Step 4.PE films keep windows away from sea water;
    Step 5.Fill in the space between each two iron pallets by air bags;
    Step 6.Tie up iron pallets in container with plastic belts.
    Our packages will ensure the windows arrive at project jobsite in good conditions

    Q4: What's your payment term?
    A: For the fist order, we usually use 30% T/T deposit + 70% T/T before loading the container. For future order, we can do 30% T/T deposit + 70% T/T balance against B/L copy.



     

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now

    You Might Also Like

    Gold Member Since 2016

    Suppliers with verified business licenses

    Import & Export Mode
    Have Own Export License
    Terms of Payment
    LC, T/T, PayPal, Western Union, Small-amount payment, Money Gram
    OEM/ODM Availability
    Yes