• Metal Joint for Lean System /Pipe Fitting (K-10A)
  • Metal Joint for Lean System /Pipe Fitting (K-10A)
  • Metal Joint for Lean System /Pipe Fitting (K-10A)
  • Metal Joint for Lean System /Pipe Fitting (K-10A)
  • Metal Joint for Lean System /Pipe Fitting (K-10A)
  • Metal Joint for Lean System /Pipe Fitting (K-10A)

Metal Joint for Lean System /Pipe Fitting (K-10A)

Processing Object: Metal
Molding Style: Stamping
Molding Technics: Stamping
Application: Flow Rack/Storage Flow/Workstation
Material: SPCC
Heat Treatment: Tempering
Samples:
US$ 0.01/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Gold Member Since 2016

Suppliers with verified business licenses

Basic Info.

Model NO.
K-10A
Surface Treatment
Electrophoresis
Forging Tolerance
+/-0.1mm
Standard
GB
Certification
RoHS, ISO 9001:2000
Transport Package
200 PCS/Box
Specification
260*210*185mm
Trademark
king9
Origin
China
HS Code
7307990000
Production Capacity
800000000PCS/Year

Product Description

Product Description:metai joint for lean tube
Item No: Material: Surface Color code Package size(mm) Package /box
K-10A Spcc Electrophoresis  Black|Nickel|Zinc|Chrome 260*210*185 200PCS


Metal Joint for Lean System /Pipe Fitting (K-10A)






Metal Joint for Lean System /Pipe Fitting (K-10A)


Metal Joint for Lean System /Pipe Fitting (K-10A)




Metal Joint for Lean System /Pipe Fitting (K-10A)

Metal Joint for Lean System /Pipe Fitting (K-10A)


FAQ:

Q1: Are you manufacturer ?
A: Yes,We are manufacture since from 2000, is a well-known company with good reputation in China even Asia.

Q2: If I need sample, could you support?
A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect.

Q3: How do you pack your product?
A: Packing steps for aluminum windows:
Step 1.Protective tape protects frames from scratches;
Step 2.Keep windows fixed on iron pallets;
Step 3.Tie up windows on the iron pallets with plastic belts;
Step 4.PE films keep windows away from sea water;
Step 5.Fill in the space between each two iron pallets by air bags;
Step 6.Tie up iron pallets in container with plastic belts.
Our packages will ensure the windows arrive at project jobsite in good conditions

Q4: What's your payment term?
A: For the fist order, we usually use 30% T/T deposit + 70% T/T before loading the container. For future order, we can do 30% T/T deposit + 70% T/T balance against B/L copy.



 

Send your message to this supplier

*From:
*To:
avatar Mr. Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now